Typical journey · PT-03

Design the facility journey

“How do I size what I am going to build?”

A decided project whose means of production must be settled before costing.

What it sequences

The catalogue services, in order of engagement. Each keeps its code, deliverable and unit of work.

  1. XPN-E2-03Processing unit sizing
  2. XPN-E2-04Energy study: load profile and mix
  3. XPN-E2-05Cold chain sizing
  4. XPN-E2-07Drying and post-harvest storage engineering
  5. XPN-E2-09Food safety management plan and HACCP
  6. XPN-E2-10Supply plan and ABC classification
  7. XPN-E2-12Continuity budget
  8. XPN-E2-13Verifiable CAPEX and supplier consultation
  9. XPN-E2-14Maintenance and technical autonomy plan

Indicative duration : 8 to 14 weeks

Outcome : A technical specification, an equipment list, a layout plan, production procedures and a verifiable investment budget.

Cycle journey — you pick one, the one you are at.
A journey is not a separate product: it is a selection of catalogue services, ordered together and sequenced. It can be extended, reduced or stopped at any milestone without renegotiating the whole. The mission quote is issued after the official opening of the file (FOD), in FCFA.
Submit my projectTalk to an adviser

← All typical journeys

Version 2026.3 — updated 24 August 2026